Tuesday, August 31, 2010

Koi Tank Construction 2010



This video shows a small fraction of the work that went into the Koi tanks which were built in the spring of 2010.  We give a big thanks to all the people that helped with the construction and made this happen!


Mike is using the bobcat to break ground.




Forming the first base.


The concrete truck has arrived.


First couple bases are poured and some walls are framed up.




Air lines, fill lines and water lines are embedded in the walls.










The trench is ready for the waste line.


Prepping the tanks for the Polyurea liner.






Applying the Polyurea spray liner to waterproof the Koi tanks.


The gravel around the Koi tanks arrives.




Electrical conduit for the power to the pumps and UV lights.


Placing the first Koi in the new tanks.








Shade sails are installed above the tanks to keep the Koi cool.


No comments: